How long does it take for Jeep to manufacture a Patriot?
From the time it is ordered or do you mean from body shop to final. From body shop to final doesn't take longer than two days.How long does it take for Jeep to manufacture a Patriot?
My tag came in my husband name, boooo hiss. Was suppose to be in my name cause everything else is in my name.Somehow I was lucky. The dealer told me 6-8 weeks and it was made and delivered in 3 weeks. That includes shipping to Canada.
And it has a tag on it that says, made for _____my name.
How long does it take for Jeep to manufacture a Patriot?