SwampFox
08-04-2006, 03:45 PM
Sounds like the plant is only running at about 80% capacity because of the work stoppages ("ranging from a few minutes to over an hour") caused by the robots.
http://www.caranddriver.com/dailyautoinsider/11389/robot-malfunctions-slow-dodge-caliber-production.html
http://www.caranddriver.com/dailyautoinsider/11389/robot-malfunctions-slow-dodge-caliber-production.html